COST/BUDGET PLANING


Tuan Duc Engineering & Construction Co. Ltd. has extensive cost planning/estimating experience available to service various type of construction projects. 


Whether the procurement method is


- Negotiated Design and Build,

- Open Cost Plus or

- Competitive Tendering


Tuan Duc Engineering & Construction Co. Ltd. is able to provide fast, accurate and efficient cost advice.


Our priority is to provide a quality projects at the lowest investment and operation cost and saving energy.


The cost planning team is working closely with the design team from the concept design stage through to the construction to ensure that at every stage the project is designed to budget.

 

 

 

Here's one price bracket housing construction cost estimates:

 

CONSTRUCTION COMPANY AND TECHNICAL TUAN DUC

 

ESTIMATED PRICE BRACKET HOUSING CONSTRUCTION

 

 

 

 

 

 

The unit price bracket below for reference Investors and financial plans accordingly. After a complete design documents approved by the investor and the agreements and discussions between the Employer and the Contractor, we will submit a detailed table of estimated scope of work includes the types of supplies attached under the bid contracts

 

 

 

 

 

 

I

PACKAGES

 

 

 

 

 

Package

Investment rate savings

The average investment rate

Investment rate type quite

Senior investment interest

1

Raw construction materials and labor Package (depending on size and application conditions)

from 2,400,000 VND / m2

from 2,600,000 VND / m2

from 2,800,000 VND / m2

from 3,000,000 VND / m2

to 2,800,000 VND / m2

to 3,200,000 VND / m2

to 3,600,000 VND / m2

4,000,000 VND / m2

2

Supplies parts perfection (depending types of materials to be selected)

from 600,000 VND / m2

from 1,000,000 VND / m2

from 1,400,000 VND / m2

from 1,800,000 VND / m2 or more

to 1,200,000 VND / m2

1,500,000 VND / m2

to 2,400,000 VND / m2

3

Turnkey bid package

from 3,200,000 VND / m2

from 3,800,000 VND / m2

from 4,500,000 VND / m2

from 5,600,000 VND / m2 or more

to 4,500,000 VND / m2

5,000,000 VND / m2

to 6,500,000 VND / m2

 

 

 

 

 

 

II

MAJOR CONSTRUCTION MATERIAL ROUGH

 

 

 

 

Name supplies

Investment rate savings

The average investment rate

Investment rate type quite

Senior investment interest

1

Reinforced concrete piles, D250

Reinforced concrete piles, D250

Pile on the market

Pile on the market

Pile on demand

2

Sand background padding, backfilling

Common sand, debris

Common sand, debris

Common sand, debris

Common sand, debris

3

Masonry sand, concrete

Cat often Mekong

Cat type 1, Golden sands

Cat type 1, Golden sands

Cat type 1, Golden sands

4

Tile, ceramic nail

Combination

Dong Nai

Saigon tunnel

Dong Nai tunnel

5

Stone 1x2, 4x6 rock

Hoa An, Dong Nai

Hoa An, Dong Nai

Hoa An, Dong Nai

Hoa An, Dong Nai

6

Concrete structures

Mark 200; 10 ± 2 cm

Mark 250; 10 ± 2 cm

Mark 250; 10 ± 2 cm

Mark 250; 10 ± 2 cm

7

Cement

Thang Long

Ha Tien, Holcim

Ha Tien, Holcim

Ha Tien, Holcim

8

Construction steel

South

Vietnam Australia - Pomina

Vietnam - Japan

Vietnam - Japan

9

Masonry mortar

Mac 50-75

Mac 50-75

Mac 75

Mac 75

10

Drainage pipe

Sunmax / Pioneers

Sunmax / Pioneers

Sunmax / Blue Ocean-UK

Sunmax / Blue Ocean-UK

11

Hot water supply pipe

Sunmax / Pioneers

Sunmax / Pioneers

Sunmax / Blue Ocean-UK

Sunmax / Blue Ocean-UK

12

De audio, power tube

Sino

Sino

Clipsal

Panasonic

13

Wire

Cadivi

Cadivi

Olympic / Cadivi

Olympic / Cadivi

14

Wire cable TV, phone, internet

Sino / Sacom

Sino / Sacom

AMP / Krone

AMP / Krone

 

 

 

 

 

 

III

MAJOR CONSTRUCTION MATERIALS FINISHING

 

 

 

 

Name supplies

Investment rate savings

The average investment rate

Investment rate type quite

Senior investment interest

1

Wall waste powder

Joton

Joton

Joton

ICI Putty

2

Water paint

CAR

Nippon

Maxilite, Dulux

Dulux / Jotun - Norway

3

Tiles, tiling

Taicera

White Horse (White Horse)

Euro tile, Dong Tam

Euro tile, ceramic Vietnam

4

Granite

 

Black Hue, Binh Dinh Rouge

Arnica, Red Ruby

Imported

5

Lancan staircase, balcony

Iron box, Oil Expo

Iron box, Oil Expo

Inox toughened glass

Inox toughened glass

6

Stair handles

Iron box, Oil Expo

Iron + Oil, Head Wood

Pyinkado wood, glass Inox

Pyinkado wood, glass Inox

7

Gate

Iron box, Oil Expo

Iron box, Oil Expo

Square iron, Oil Expo

Iron box, Oil Expo

8

Bedroom door

Industrial wood doors

Industrial wood doors

Wooden doors Pyinkado

Wooden doors Pyinkado

9

Windows, doors (outdoor)

Iron + 5 glass lens

Aluminum powder, a 5 cups

Military Pass or finishing aluminum II

Doors Euro + 8mm tempered glass

10

WC door (0,7mx2m)

Plastic doors Yaho

Aluminum powder, a 5 cups

Quan Dat aluminum, finishing

Doors Euro + 8mm tempered glass

11

Lock

Round Lock Taiwan

Round Lock Taiwan

Lock Korea, Italy

Lock Korea, Italy

12

Plaster ceiling

Goods Market

Goods Market

Vinh Tuong plate frames

Vinh Tuong plate frames

13

Steel tanks

Son Ha, Dai Thanh

Nam Thanh

full US

full US

14

Faucets, Sink

full US

Inax

American Standard

Toto

15

Toilet, washbasin

Inax

Inax

American Standard

Toto

16

Accessories 7 items (in feet)

Inax

Inax

American Standard

Toto

17

Switches, Sockets, MCB

Sino Vanlock

Panasonic

Panasonic

Clipsal / Panasonic / Schneider

18

Lamps

Duhal, Paragon

Philips

Philips

Philips, Panasonic

IV

MATERIAL NOT INCLUDED ARE SEPARATE ESTIMATES

 

 

 

Name supplies

Investment rate savings

The average investment rate

Investment rate type quite

Senior investment interest

 

HT energy water

Goods Market

Goods Market

sunflower

Ariston / Ferroli

 

Refrigeration systems

Funiki, Reetech

LG, Hitachi

Sanyo, Mitsubishi, Sharp

Toshiba, Panasonic, Daikin

 

TB kitchen + cupboard

Manni + oval transplant

White Wolf

Manni 100%

Pyinkado 100%

 

Wooden wall cabinets

Manni + oval transplant

White Wolf

Manni 100%

Pyinkado 100%

 

 

 

 

 

 

NOTE: CALCULATING M2 CONSTRUCTION

 

 

 

 

1. Foundation: depending on geological conditions (substrate) can cost from 40% or more above the ground floor area

 

 

2. Basement: cost of 150% or more over the area

 

 

 

3. Ground floor: charged 100% of the area

 

 

 

 

4. Mezzanine: 100% at the position of + 70% floor pour the remaining area

 

 

 

5. floor: 100% area

 

 

 

 

6. Terrace: 100% of the area with roof + 75% floor for the rest area

 

 

7. 30% iron sheet roof; Tile roof usually 50%; 70% reinforced concrete roof, concrete roof tile stickers: 100% area

 

 

8. Fences, garden are calculated separately according to md, depending on the level of investment

 

 

 

* Investors should consider the corresponding cost of the design dossier and the corresponding types of materials avoid falling into the "matrix" calculated m2

 

 

 

 

 

 

Other notes of tender raw materials and labor component Package: The item will work and not included in the labor

 

 

 

 

 

 

 

Carpentry processing section: stair handrails, doors, kitchen cabinets, wall cabinets ...

 

 

 

Iron parts machining, powder coating

 

 

 

 

Part processing granite stairs, tertiary

 

 

 

 

Part erection plaster ceiling, glass wall toilet

 

 

 

Part installation of doors, windows, rolling door, sliding door

 

 

 

 

Part refrigeration installation, lightning, cameras, fire protection

 

 

 

Part ONU power meter - water into the city system

 

 

 

Part iron truss roof tiles, decorative iron aluminum lam

 

 

 

 

Part water heater and plumbing solar heating

 

 

 

 

 

 

 

 

Contact Info:

 

 

 

 

CONSTRUCTION COMPANY AND TECHNICAL TUAN DUC

 

 

 

Trading Address: 73 ROUTE 39, Tan Quy Ward, District 7, HCMC. HO CHI MINH

 

 

Telephone: (84-8) 37712776 - Mobile: 0903 660 556 - 0986 706 706

 

 

Email: vuonganduong@gmail.com

 

 

 

Email: tiep.tuanduc@gmail.com