INFRASTRUCTURE, FACTORY

           
Rev. Nil, January 01, 2016        
           
TUAN DUC ENGINEERING & CONSTRUCTION CO. 
UNIT RATE FOR INDUSTRIAL FACTORIES CONSTRUCTION
           
S/N
DESCRIPTION
UNIT
MIN. QTY
UNIT RATE REMARKS
1
Piling D250 - reinforced concrete pile
m
150
321,000 Vinakyoei steel, flange 6mm
2
Piling - cajuput pile, 4m length, D8-10
pcs
100
30,000 Cajuput pile, 1st class, straight
3
Demolish concrete pile head 
pcs
30
65,000  
4
Excavation by manual
m3
15
68,250  
5
Excavation by machine
m3
500
16,600  
6
Backfilling by manual
m3
15
52,500  
7
Backfilling by machine
m3
500
12,600  
8
Elevating by sand filling
m3
100
166,000  
9
Elevating by aggreagte 0-4
m3
100
214,000  
10
Removal surplus soil
m3
100
55,000  
11
Lining concrete by aggregate 1x2, Grade 150
m3
10
940000 Cement Hà Tiên, Holcim
12
Structure concrete 1x2, Grade 250
m3
10
1,250,000 Cement Hà Tiên, Holcim
13
Normal formworks
m2
100
160,000  
14
Special formworks (silo, roof )
m2
50
195,000  
15
Reinforced steel bars
kg
200
23,900 Vinakyoei or Pomina steel
16
Construct brick wall 100mmTHK by hollow brick 8x8x18
m3
5
1,350,000 Dong nai, Binh Duong tunnel brick
17
Construct brick wall 200mmTHK by hollow brick 8x8x18
m3
5
1,250,000 Dong nai, Binh Duong tunnel brick
18
Construct brick wall 100mmTHK by solid brick 4x8x18
m3
5
2,050,000 Dong nai, Binh Duong solid brick
19
Construct brick wall 200mmTHK by solid brick 4x8x18
m3
5
1,950,000 Dong nai, Binh Duong solid brick
20
External plastering by cement mortar Gr. 75
m2
100
77,000 Cement Hà Tiên, Holcim
21
Internal plastering by cement mortar Gr. 76
m2
100
67,000 Cement Hà Tiên, Holcim
22
Plastering stairs, louvers, columns, gutters by cement mortar Gr.75
m2
100
77,000 Cement Hà Tiên, Holcim
23
Tiling floor by ceramic tiles
m2
100
270,000 Brick price 200.000đ/m2
24
Tiling wall by ceramic tiles
m2
50
270000 Brick price 200.000đ/m3
25
Tiling floor by granite
m2
50
930,000 Black granite Phú Yên, Red granite Bình Định
26
Construct exposed grid ceiling 
m2
50
124,000 9mm board, Vinh Tuong frame
27
Construct concealed ceiling 
m2
50
146,000 9mm board, Vinh Tuong frame
28
Construct plastic ceiling 
m2
50
109,000 Vietnam
29
Apply mastic to walls
m2
100
24,000 Nippon mastic
30
Apply mastic to columns, beams, ceilings
m2
100
24,000 Nippon mastic
31
Painting emulsion paint to external walls 
m2
100
25,000 Nippon primer and finishing coats
32
Painting emulsion paint to internal beam, celing, walls 
m2
100
20,000 Nippon primer and finishing coats
33
Waterproofing according to technology process
m2
50
175,000 Sika technology
34
Gypsum board partition single side
m2
30
205,000 12mm board, Vinh Tuong frame
35
Gypsum board partition 02 sides
m2
30
225,000 12mm board, Vinh Tuong frame
36
Heat resistance treatment to roof slab
m2
100
210,000 Hollow brick
37
Tiling roof by clay tile
m2
100
223,000 Dong Tam clay tile
38
Tiling roof gable roof, hip roof
pcs
30
43,000 Dong Tam clay tile
39
Steel structure (pillars, frame, trusses, sky light, flushings, Khung (cột + khung + dầm + cửa trời + mái hắt)
kg
3000
31,000 CT3 steel, Vietnam standard
40
Brace (roof, pillars, purlins)
kg
1000
39,000 CT3 steel, Vietnam standard
41
C purlins (black steel painted)
kg
2000
29,000 CT3 steel, Vietnam standard
42
Corrugated sheet metal 0.4mm
m2
50
187,000 CT3 steel, Vietnam standard
43
Cemboard platform 20mm THK (100kG/m2)
m2
50
222,000 Thong Hung, Vietnam
44
Roofing by sheet metal 
m2
100
167,000 Hoasen, Povina tile
           
Note:  the price might change according to working condition and the quantities
           
Contact        
TUAN DUC ENGINEERING & CONSTRUCTION CO. LTD.      
Address: 73 STREET, TAN QUY WARD, DISTRICT 7, HO CHI MINH CITY 
TELEPHONE: (84-8) 37712776 - DĐ : 0903 660 556 - 0986 706 706 
Email: vuonganduong@gmail.com
Email: tiep.tuanduc@gmail.com